top of page
Construction & Home Builds
1st fix: Anything during the construction and before plastering. Stud walls, floor joists, ceilings, roof struts, door frames etc.
​
2nd fix: Finishing touches, generally after plastering. Door hanging, skirting, architrave, flooring etc.
Say Hello

HOW TO enquire
Get in touch directly or use the form.
​
LEAD TIMES
Everything is made to order. Lead times can vary from 1–5 weeks, depending on the piece and our current production demand. Give us a shout for our most up to date lead times.
Call: 07947 758 757
Email: hello@dbtcarpentry.co.uk
Designed & maintained by Niamh McClymont
bottom of page