top of page
Construction & Home Builds
1st fix: Anything during the construction and before plastering. Stud walls, floor joists, ceilings, roof struts, door frames etc.
​
2nd fix: Finishing touches, generally after plastering. Door hanging, skirting, architrave, flooring etc.
Freestanding & fitted furniture
Think fitted wardrobes, storage, alcove cupboards, bay window seats, shop shelving, occasional tables and stools, bookcases, bench seating, coffee tables and children's play cubes.
​
Every client gets the same treatment - design, build and install. All designing is done with CAD programs, allowing you to virtually walk through your future product.
​
Heres most of my commissions to date:
bottom of page