top of page
Construction & Home Builds
1st fix: Anything during the construction and before plastering. Stud walls, floor joists, ceilings, roof struts, door frames etc.
​
2nd fix: Finishing touches, generally after plastering. Door hanging, skirting, architrave, flooring etc.
100% hand built kitchens, by DBT. Get ‘em while they’re hot! Birch plywood cabinets with shaker doors and Pewter Finsbury Knobs. All made from scratch to fit to the clients spec, finished in Farrow and Ball paint. 40mm prime Oak worktop with Belfast Sink. Really enjoyed designing and building this one, although the not-so-square walls made it tricky to fit. Thanks Holly for the commission!
Goonown, Cornwall








bottom of page