top of page
Construction & Home Builds
1st fix: Anything during the construction and before plastering. Stud walls, floor joists, ceilings, roof struts, door frames etc.
​
2nd fix: Finishing touches, generally after plastering. Door hanging, skirting, architrave, flooring etc.
Bespoke fitted wardrobe made entirely from Birch Ply. Everything has been scribed to the walls, ceiling and floor. Drawer unit on the bottom, hanging space in the middle and storage above. This has been a task to say the least, but I’ve learnt SO MUCH… It’s all worth it cos it looks bangin’! Love the lines and finish. Have a scroll through the piccies and let me know what you think. Big love everyone!
Birch ply wardrobe








bottom of page