top of page
Construction & Home Builds
1st fix: Anything during the construction and before plastering. Stud walls, floor joists, ceilings, roof struts, door frames etc.
​
2nd fix: Finishing touches, generally after plastering. Door hanging, skirting, architrave, flooring etc.
After some serious head scratching, beard twirling and some strange thinking noises, I’ve finished the cupboard. Real tricky working out the best way to fix new to old and how to best to hide the gas meter, but got there in the end. Super happy with the finished product!
Bay window seat





bottom of page