top of page
Construction & Home Builds
1st fix: Anything during the construction and before plastering. Stud walls, floor joists, ceilings, roof struts, door frames etc.
​
2nd fix: Finishing touches, generally after plastering. Door hanging, skirting, architrave, flooring etc.
60mm thick Oak slab coffee table with Mahogany bow tie and finger jointed Oak legs, all finished in Fiddes premium wax. This was commissioned by my aunty in London, but for me, it acted as a way to celebrate my uncles life which was sadly taken recently as I know he would have loved it! He always wanted to support me and his family in all their business and personal life. Happy coffee table times to my family in London!!
60mm Oak coffee table










bottom of page