top of page
Construction & Home Builds
1st fix: Anything during the construction and before plastering. Stud walls, floor joists, ceilings, roof struts, door frames etc.
​
2nd fix: Finishing touches, generally after plastering. Door hanging, skirting, architrave, flooring etc.
Am I turning into a van conversion-er? Brand spanking new Transit + my good mate Mike. He’s a businessman working from home (pre-covid and everything!), so we wanted to keep it smart, low profile and sleek. The bench seat folds down to a double bed, moveable/removable desk, 240v electronics, concealed black out blinds and insulated curtains. Really enjoyed the simple joinery used in the bed frame. Pretty simple, pretty sick.
The businessman










bottom of page