Construction & Home Builds
1st fix: Anything during the construction and before plastering. Stud walls, floor joists, ceilings, roof struts, door frames etc.
​
2nd fix: Finishing touches, generally after plastering. Door hanging, skirting, architrave, flooring etc.
Van Conversion #2. Local legend and now good mate, Tom, bought this van as a shell and handed it over to me to convert. Includes: cladding almost all over, a permanent square bed which pulls out into full length, Belfast sink with copper pipe tap, fridge freezer, solar panel on the roof decking, plenty of storage (with soft close hinges of course). The van has been handed over in a blank canvas style which allows Tom and his girlfriend to personalise it to the max. Aaaaaand you’ll never guess… I’ve already got van conversion #3 booked in!
A van for Tom
​









