top of page
Construction & Home Builds
1st fix: Anything during the construction and before plastering. Stud walls, floor joists, ceilings, roof struts, door frames etc.
​
2nd fix: Finishing touches, generally after plastering. Door hanging, skirting, architrave, flooring etc.
A simple yet satisfying job. Alcove unit with 40mm Prime Oak top and shelving.
​
Modern Marquetry specifics: Iroko with recliamed timbers and plastics.
​
Materials: This contemporary design features professionally finished MDF panels, 40mm Prime oak.
​
Finish: A hard-wearing Osmo top oil protects the Oak, whilst professionally finished MDF panels allows for easy cleaning.
Alcove & Shelving






bottom of page